Electromechanical components such as relays and switches often must undergo endurance tests that verify their reliability and safety. Regulatory standards typically have compliance criteria that ...
This new three -phase test instrument addresses the increasing need for three-phase testing capability in electrical distribution substations, renewable power generation stations and industrial ...
Megger’s new SMRT 36 smart protective relay test set is suited not only for testing today’s installations and legacy plant, but also for meeting the future challenges associated with testing the smart ...
A few weeks ago, I ordered a relay tester. Never had one, always wanted one. Whenever I doubt the proper functioning of a ...
The PGT-0400 is a ground-fault-relay test unit designed to test current pickup level, time-delay and coordination of ground-fault protection. The tester injects current through the window of installed ...
Relay testing is one of those challenging areas where there never seems to be a shortage of questions. The technology adopted in both the relays themselves and in the equipment used to test them is ...
The cost of component failures continues to increase as electronic products become more complex. Most component replacement costs are associated with marginal devices that become intermittent or fail ...
There’s a problem with fuses. On the face of it, testing would seem to be a one-shot deal — exceed the rated current and see if it blows. But once you know the answer, the device is useless. If only ...